I just learned, that there is a way to preload the data to the cache, and after preloading, PowerBI refresh is fast, without timeout issue.
It was mentioned, that a batch should be run scheduled.
As we don’t have servers for this purpose, my question is, that is it possible to preload the data with Power Automate?
It would be nice to have an “only preload” feature.That means, It is not necessary to see the whole data in Power automate flows. Is there an easy way to do it?
It would help me a lot with the refreshes with timeout issue.